This light engineering business needed to improve production flow, reduce inventory and improve workplace organisation.

The factory manager decided to embark on a 5S programme to do something about it, bringing in consistency, generally de-cluttering, and bringing a standardised approach to his factory.


 

 




Want to know more about 5S? Click here.


Back to Case Studies >

 

Testimonials

It’s brilliant! We used to produce 3 or 4 full bins of waste a day now we’re down to less than ½ a bin! The final bit of work we do should reduce it to virtually nothing!

Operator – Branded Bakery

It must be said that the concept of change management which LI were asked to bring in was a very big ‘ask’. Their work on the floor was very beneficial to change management. LI try to problem solve by using the workforce. This has to be done tactfully. They achieved it. They had the respect of the people on the floor and the management which is a major credit.