Results graph – Non Manufacturing image

Rapid Lean Manufacturing Results / Results graph – Non Manufacturing

Testimonials

Over the past three months I have been concentrating mainly on changeover reduction, waste reduction and increased throughput. There has also been a challenge to behavioural patterns. All of these efforts have been using the knowledge that you gave me and I am delighted to say that all have been successful, culminating in increased throughput, less waste and an increase in OEE from an average of 78% to around 90%. There has also been a marked improvement with people issues.

Alwin Waterhouse, Improvement Manager, British Bakeries

We have known about that problem for ages, why did we wait until now to sort it out?

Operative